Tuesday, July 29, 2014

Course update

Last Thursday the course received 3" of rain and another .25" on Sunday.  With all of the exposed dirt from construction, I was expecting really bad things.  To my surprise, I was able to ride the entire course Friday morning and it wasn't nearly as bad as I thought.  There is some repair work that is taking place, but I think it could have been much worse. 

 
This bunker was completely filled with water
 

Before the rains, we were able to get final approval on 5, 6 and 7 greens.  We are still on track to start sprigging this week and we will also start seeding greens and "native areas".  Irrigation is almost done on the course and we will move right into the driving range and short game area. 

Final touches on #6 green



Last week we were able to vent all greens.  Venting greens helps relieve some compaction and helps get oxygen into the root zone.  These ventings are one of the most important agronomic practices that we will do all year.  Our greens, just like you and me, need to breathe.  Opening them up with these solid tine aerifications really allow our greens to breathe.

We also had a little fun last week.  Our friends at the Timmons Group came out with one of their quad copter drones. We were able to get some footage of the existing course and some of the new construction.  We should have everything edited this week.  As soon as it's ready, I will post the video for everyone to see. 

The Timmons drone taking flight!


Monday, July 14, 2014

Bunkers, concrete, grass and irrigation!!!

We are moving right along on the construction.  We now have irrigation on 4, 5, 6 and 7.  It has been started on 3 as well.  The main line should be completely looped around the course by Wednesday!  Bunker construction started on Saturday along with some grassing.  The last two greens on the course have been approved for drainage, gravel and mix.  These will be completed this week.  The Nicklaus architect will be back out for three days on the week of July 23 and will start floating greens.  Once the greens have been floated, will will start seeding and growing them in.  The plan is to start spigging tees, fairways and rough this week as well!

 

Here is the 1st bunker in the construction process. Sand should be finished today
 
New path on #7
 
 
Last week, we also started our tee and collar conversion.  Collars should be finished by Wednesday and tees within the next two weeks.
 


Existing grass being stripped from 3 tee surround
 
 
Stay tuned for another update in the next week or so.  Have a great week!



Wednesday, June 25, 2014

Construction update

We have had a great couple of weeks! Irrigation has been installed on 6 and 7 and started on 5.  We should be done with 5 this week.  Once the heads are installed, a box is built around each head, similar to a form used for concrete.  These are used as a template to get a 4" layer of topsoil around each head.  This helps the person spreading the rest of the topsoil stay away from the heads.  Topsoil is being spread as I am typing this.  They will work backwards from 7 with topsoil.



Topsoil on #7 before it's spread
 
Topsoil around an irrigation head
 
Wire set up on the irrigation trailer, ready to go
 
 
Last week we had a visit from Chris, the Nicklaus architect.  The weather held out for us and it was a very productive meeting.  We were able to mark the grassing lines on 5, 6 and 7.  The fairway bunkers on 4 were laid out and we have since rough shaped these bunkers.  Chris was able to spend some time on 2 and 8, as well.  He gave us his idea of what he wants on those holes and the rough grading has begun. 
 
Deciding where the fairway bunkers are going to on #4
 
 
I believe Chris will make another visit next week and we should have bermudagrass on the ground by the second week in July.  This morning we made a lime application in preparation of sod and sprigs and water should be turned on the beginning of next week!

 


Wednesday, June 4, 2014

Construction update

We have finally had some good construction weather!  Twelve of the last fourteen days and been dry and it shows with the progress being made on the course.  Five, six and seven greens all have drainage, gravel and mix in them.  Drainage, gravel and greens mix are being installed on three and four this week, as well.  Storm drainage is complete on five and seven.  Six will be complete this week.  We will also begin installing irrigation this week.  The Sanders irrigation crew arrived last night and this should really get things moving.

As far as grassing goes, we are waiting on turf farms.  They all seem to be three to four weeks behind because of the cold winter and wet spring.  Once the farms are ready to start harvesting sod and sprigs, the irrigation will be in the ground and we will be ready to start growing some grass!!

On the existing holes, the crew has been working very hard over the last couple of weeks to get the bunkers in great shape.  All bunkers surrounds have been mowed and we are in the process of edging all of the zoysia grass.  We are also making sure that all of the sand depth is consistent.  So far they look great!





Thursday, May 8, 2014

Spring is finally here!

I believe we have finally made it to Spring, with the next two days feeling a little like Summer.  Greens have healed from aerification and bermudagrass is finally growing.  There is some disease on the bermuda.  It isn't damaging anything, it's just unattractive.  Large patch is something that we get a little bit of every year, but with the cool, wet spring that we have had, there seems to be quite a bit more than usual.  As the temperature goes up, the bermuda will grow right out of it.

 
 
This week, the installation of the fan on seven was finally finished.  We are waiting on Dominion Power to make their connections and we should have power within the next seven days.
 
 
 
On Monday, we had the chance to demo a couple of new pieces of equipment.  The first was a verti-cutter/flail mower/vacuum.  The Wiedenmann Super-Vac 600 has the ability to verti-cut our fine maintained turf or mow down our native areas.  While performing either of these tasks, it vacuums up all of the debris at the same time.  This allows us to eliminate one part of the process and golfers don't have to deal with the delay in cleanup time. 
 
As you can see, there is nothing left to clean up
 
The second piece that we were able to demo was a deep tine aerifier.  This aerifier will be able to break through our very hard, clay soils to a depth of 11".  Aerifying that deep helps greatly with compaction and rooting.  It will help with drainage, as well.  When our soils dry out, there is nowhere for the water to go.  These deep channels will help get water into the soil, instead of just running off to the low areas around the course. 
 
When using solid tines, there is very little disruption to the playing surface

We have been very busy over the last couple of weeks and our summer help can't get here soon enough! 




Sunday, April 20, 2014

Construction update

The last week has been great!  A lot of progress has been made on the construction of the new nine holes.  The Nicklaus architect was here for two days this week.  While he was here he put his stamp on #6 green and #7 green, fairway and tee.  We look forward to him coming back at the beginning of May. 







Most of #7 fairway has been shaped.  Drainage is being installed on #7 fairway.  Drainage will be installed on #7 green this week.  Tees have been shaped and cored out.  Drainage will be installed in the tees this week, as well.  The next step is to get approval on the entire hole and start installing irrigation.
Drainage being installed on #7 fairway
 
The black tee on #7 after it's been cored. Waiting on drainage and sand
 

#6 green has been shaped and is ready for drainage this week.  The tees are currently being shaped and we will get started on the fairway this week. 

#5 was also started last week.  The green complex was rough graded.  That includes the green, bunkers and other features around the green.  This seems to be a really cool green surround.  I don't think it's going to be easy, but it looks good. 
My helpers giving some perspective on the depth of the greenside bunker on #5. My youngest is in the middle of the bunker and his older brother is on the top of the bunker.
 
 
 
This week looks like it will be another productive week.  We dodged a storm this weekend.  If we could dodge another this week, we will be able to get a bunch accomplished.  As always, if anyone has any questions, just let Chad or me know.  

Tuesday, April 8, 2014

Construction update and Green bermudagrass!!

Last week was a great week for construction. The crew was able to get 6 and 7 green surrounds finished. They are now waiting on approval from the architect. Number five green surround will also be finished this week. Tee complexes and bunkers will be shaped before the architect makes another visit next week. Once he approves an entire hole, the irrigation is then installed and we wait for the weather to cooperate and we start grassing those holes.

#6 green surround

#7 green surround

After a few warm days last week, we have some green bermudagrass!!!  It's not a lot, but we will take whatever we can get.  With the inch of rain we got yesterday and with a low of 60 last night, we should start to see quite a bit more popping up this week.  It looks like no freezing temperatures in the next ten days, so hopefully no setbacks.  Last week we also got greens aerified and a bulk lime application was made.  We pulled 5/8" cores on a 2" spacing.  This helps reduce the amount of organic material that is built up throughout the year and also creates channels to let water, oxygen and nutrients move into the rootzone.  The greens are healing nicely and should be in great shape by the beginning of next week. 

This picture was taken the day after aerification